Technical Audit of the Application of BA79
Highways Agency | |
Contract No: | 2/419 |
Contractor: | Parsons Brinkerhoff Ltd |
Introduction
John Collins of the National Assembly for Wales suggested a review of the Bridge Assessment and Strengthening program at BOF2, and submitted a formal proposal at BOF3.
The Highways Agency instigated a project which covered many of John's proposals. This project has now completed, and the final reports are listed below.
Documents
Assessment Final Report (excluding specific appendices) (1.78MB)
BA79 Final Report (excluding specific appendices) (1.5MB)