[Advance to content]

Highways Agency Contract Reports

By keyword

8 Reports with keyword 'Pretensioning':

The effects of steam curing on precast pretensioned bridge beams report on work to brief stage (c)
Burks Green and Partners, 1977

The effects of steam curing on precast pretensioned bridge beams adendum report on experimental investigation
Burks Green and Partners, 1979

Investigation into aspects of design and manufacture of standard precast pretensioned bridge beams
Aspect no. 1 End zone cracking Vol. 1 Text
Burks Green and Partners, 1980

Investigation into aspects of design and manufacture of standard precast pretensioned bridge beams
Aspect no. 1 End zone cracking Vol. 2 Figures and tables
Burks Green and Partners, 1980

Investigation into aspects of design and manufacture of standard precast pretensioned bridge beams
Aspect 1 [End zone cracking] Addendum Design charts for the end zones of inverted T & M beams
Burks Green and Partners, 1979

Investigation into aspects of design and manufacture of standard precast pretensioned bridge beams
Aspect no. 2 Addendum report on the effects of steam curing
Burks Green and Partners, 1980

Investigation into aspects of design and manufacture of standard precast pretensioned bridge beams
Aspect no. 3 Tack welding
Burks Green and Partners, 1980

Shear capacity of pretensioned inverted T-beams with infill concrete by D.W. Cullington, M.E. Hill and D.P. Sykes
Transport Research Laboratory, 1995