Highways Agency Contract Reports
By keyword
22 Reports with keyword 'Repairing':
A19 Leven Valley viaduct report on procedure trials for repair to soffits of prestressed beams at tendon deflection points
Cleveland County Council, 1992
Adhesive joints progress report no. 1 by J.R. Cuninghame
Transport Research Laboratory, 1995
Angel road bridge pier KComments on the Tests carried out on the Pagel 12-16 Concrete
Gifford, 1985
Concrete bridge repair options interim report no. 1 by J.R. Cuninghame
Transport Research Laboratory, 1999
Concrete inlays for highways report on Belgian experience meeting held in Mons, Belgium on 10 February 1999
British Cement Association, 1999
Deterioration of structural concrete prevention, early detection, repair general report
Cement and Concrete Association, 1984
Durability of repairs to concrete highway bridges by J.R. Atherton
Transport Research Laboratory, 1995
E070A/HG the repair of a highway embankment by grout injection by D.G. Boden and K.C. Brady and D.J. Ayres
Transport Research Laboratory, 1993
The effects of alkali migration on alkali-silica reaction to concrete repairs interim report to TRRL G. Sergei and C.L. Page
Aston Material Services Limited, 1992
The evaluation of repair materials for concrete pavements by J.W.E. Chandler, R.A. Barnes and G.C. Mays
Transport Research Laboratory, 1996
H3/8B performance trials on trench reinstatement A52 Brailsford, Derby status report, April 1992 by Marilyn H. Burtwell
Transport Research Laboratory, 1992
Long-term performance of trench reinstatements and their impact on the adjacent pavements by Marilyn H. Burtwell and John H. Howe
Transport Research Laboratory, 1996
Performance of slope maintenance and repair techniques on the Cambridge Northern Bypass by D.G. Boden
Transport Research Laboratory, 1995
Performance of trench reinstatements Southampton and West Sussex sites by Marilyn H. Burtwell and J.N. Hurst
Transport Research Laboratory, 1995
Performance report for Proton sprayed microconcrete repair concrete
Frank Graham Consulting Engineers, 1993
Performance report for SikaCem Gunite 133 used on Altofts River bridge, DOT no. M62/122.30, date of inspection: June 1993
Frank Graham Consulting Engineers, 1993
Performance trials on trench reinstatement A52 Brailsford, Derby status report, April 1992 by Marilyn H. Burtwell
Transport Research Laboratory, 1992
Report on concrete repairs to Blackgates bridge, DTp no. M62/113.10
Frank Graham, 1992
Standard tests for repair materials and coatings for concrete permeability
Arup Research and Development, 1990
Trench reinstatement trial at TRL's pavement test facility by M.H. Burtwell and D.I. Blackman
Transport Research Laboratory, 1994
The use of fibre reinforced plastics for strengthening, modification and repair final report for a joint industry project
Vol. 1
Devonport Management Limited, 1997
The use of fibre reinforced plastics for strengthening, modification and repair final report for a joint industry project
Vol. 2
Devonport Management Limited, 1997