Highways Agency Contract Reports
By keyword
6 Reports with keyword 'Stiffener':
Contract 3/295 call off contract for advice on special structures sub-panel buckling criteria for longitudinally stiffened plate panels briefing note
Flint and Neill Partnership, 2001
Desk study of the fatigue of trough stiffener to crossbeam joint by G.P. Tilly and J.R. Cuninghame
Transport Research Laboratory, 2001
Fatigue in steel bridges final report on adhesive bonded stiffeners Nigel K. Emberson
Transport Research Laboratory, 1996
Fatigue in steel bridges final report on adhesive bonded stiffeners Nigel K. Emberson
Transport Research Laboratory, 1996
Fatigue of orthotropic decks trough / crossbeam / deck joint interim report no. 2 by J.R. Cuninghame
Transport Research Laboratory, 2002
Sub-panel buckling criteria for longitudinally stiffened panels final report
Flint and Neill Partnership, 2001