Highways Agency Reports

By Publisher

10 Reports Published by 'Frank Graham Consulting Engineers'

Calibration studies of EC3 part 2
Shinfield Frank Graham Consulting Engineers, 1997

Calibration studies of EC3 part 2
Annex 1 Calibration calculations
Shinfield Frank Graham Consulting Engineers, 1997

M1 Fiveways Interchange flyover northbound and southbound further assessment report
Vol. 2
Shinfield Frank Graham Consulting Engineers, 1996

M4 crosshead repairs, A4 Boston Manor Road to Chiswick roundabout effect of A4-M4 link road
Shinfield Frank Graham Consulting Engineers, 1994

Design considerations for flat arch bridge abutments by G.B. Card
Frank Graham Consulting Engineers, 1993

HGV collision loads on bridge supports proposed amendments to BD /92, The assessment & strengthening of highway bridge supports G. Hughes
Shinfield Frank Graham Consulting Engineers, 1993

Performance report for Proton sprayed microconcrete repair concrete
Shinfield Frank Graham Consulting Engineers, 1993

Performance report for SikaCem Gunite 133 used on Altofts River bridge, DOT no. M62/122.30, date of inspection: June 1993
Shinfield Frank Graham Consulting Engineers, 1993

M62 KirkleesViaduct failure of fixed bearings interim report
Frank Graham Consulting Engineers, 1990

Principal inspection report for Kirklees Viaduct, DOT no. M62/94.80/1
Frank Graham Consulting Engineers, 1990

19 Additional Reports that may be by 'Frank Graham Consulting Engineers'

Report on concrete repairs to Blackgates bridge, DTp no. M62/113.10
Shinfield Frank Graham, 1992

Kirklees Viaduct report on the failure of the fixed bearings
Vol. 1
Shinfield Frank Graham, 1991

Kirklees Viaduct report on the failure of the fixed bearings
Vol. 2
Shinfield Frank Graham, 1991

Tunnel and bridge site incident monitoring interim report
Reading Frank Graham and Partners, 1987

Traffic measures used in major tunnels and bridges in the United Kingdom
Reading Frank Graham and Partners, 1985

ENV 1993-2 design of steel structures steel bridges
WSP Graham Limited, 1999

Mobile phones and featureless highways
WSP Graham Limited, 1999

Precast concrete pipes and ancillary concrete products
Association of Consulting Engineers, 1994

Manual of British water engineering practice: volume III water quality and treatment
Institute of Water Engineers, 1969

Manual of British water engineering practice: volume 1 organization and management
Institute of Water Engineers, 1969

Urban street activity in 20 MPH zones study report following zone implementation Ayres Road, Old Trafford after survey 2, twelve months after implementation final zone report
Sale Allott and Lomax Consulting Engineers, 2000

Urban street activity in 20 MPH zones study report following zone implementation Fairfield Area, Warrington after survey 2, twelve months after implementation final zone report
Sale Allott and Lomax Consulting Engineers, 2000

Urban street activity in 20 MPH zones study report following zone implementation Monfa Road area, Bootle after survey 2, twelve months after implementation final zone report
Sale Allott and Lomax Consulting Engineers, 2000

Urban street activity in 20 MPH zones study report following zone implementation after survey 1 (three months after implementation) Royton, Oldham
Sale Allott and Lomax Consulting Engineers, 1999

Fifth draft advice note on water quality and drainage assessment and design for pollution control
Owen Williams Consulting Engineers, 1996

Implementation of BS 8004 : 1986 for foundations of permanent highway structures calibration study
Sale Allott and Lomax Consulting Engineers, 1996

An overview of testing in highway construction finalreport
Sale Allott and Lomax Consulting Engineers, 1993

An overview of testing in highway construction phase 1 report and background papers
Sale Allott and Lomax Consulting Engineers, 1993

An overview of testing in highway construction phase 2 report
Sale Allott and Lomax Consulting Engineers, 1993