Highways Agency Reports
By Year
1979 | 1978 | 1977 | 1976 | 1975 | 1974 | 1973 | 1972 | 1971 |
1979
A study of speed/flow relationships on rural single carriagway roads
Martin and Voorhees Associates, 1979
A study of speed/flow relationships on rural single carriagway roads
Martin and Voorhees Associates, 1979
Council Directive of 17 December 1979, on the protection of groundwater against pollution caused by certain dangerous substances (80/68/EEC)
Council of European Communities, 1979
Field examination of welded bridges for the department of transport
Sandberg Consulting, 1979
Final contract report: an assessment of techniques for the repair of bridge deck longitudinal welds
The Welding Institute, 1979
Final contract report: fatigue of partial penetration trough stiffener to deck plate welds
The Welding Institute, 1979
Final contract report: variable amplitude fatigue tests on welded joints
The Welding Institute, 1979
Investigation into aspects of design and manufacture of standard precast pretensioned bridge beams
Aspect 1 [End zone cracking]
Addendum Design charts for the end zones of inverted T & M beams
Newark, Notts Burks Green and Partners, 1979
M6 motorway viduct: Bescot Viaduct summary of reports
Husband and Company, 1979
Major/minor priority junction study
Martin and Voorhees Associates, 1979
Major/minor priority junction study
Martin and Voorhees Associates, 1979
Proposals for dangerous substances (conveyance by road) regulations
Health and Safety Commission, 1979
Report on the design of armco multi-plate superspan structures
Stirling Maynard and Partners, 1979
Report on the provision of access to the main deck structure for maintenance and the supply of services along the complete length of the structure [Forth Road Bridge]
Edinburgh W.A. Fairhurst and Partners, 1979
The effects of steam curing on precast pretensioned bridge beams adendum report on experimental investigation
Newark, Notts Burks Green and Partners, 1979
The rebend test for reinforcing steels [D.B. James, T.C. Harrison]
Rotherham British Steel Corporation, Sheffield Laboratories, 1979
Very minor improvements site surveys
Martin and Voorhees Associates, 1979
WEB tests on experimental box girders nos. 4, 6 & 7
Mander, 1979
1978
A study of speed/flow relationships on hilly rural all purpose dual carriageways
Martin and Voorhees Associates, 1978
A study of speed/flow relationships on rural motorways and all purpose dual carriageways
Martin and Voorhees Associates, 1978
B116/5 design studies design of composite bridges final report on comparison of B116/4 and B116/5 crack control requirements
Taunton South Western Road Construction Unit, 1978
Background to B.S. 5499 PART 2
Henderson, 1978
Composite box girder bifurcated bridge project: model conception, design, manufacture instrumentation and testing arrangements.
Imperial College, 1978
Composite box girder bifurcated: model conception, design, manufacture instrumentation and testing arrangements.
Imperial College, 1978
Concrete cover to reinforcement in highway bridges: a pilot study comparison of cover before and after concrete placement
Transport and Road Research Laboratory, 1978
Control of fatigue cracks by hole drilling
The Welding Institute, 1978
Fatigue of socketed cable: in-line and transverse tests on 38mm specimens
Imperial College, 1978
Fatigue strength of repair welds in a trough to deck plate joint
The Welding Institute, 1978
Final contract report: assessment of techniques for the repair of steel bridge decks - part 3 - full-scale repair tests
The Welding Institute, 1978
Final contract report: fatigue of butt welds made on backing bars
The Welding Institute, 1978
Further fatigue tests on welded joints under compressive loading: final report
The Welding Institute, 1978
M 56 to Lea by Backford contract M56/11
Taylor Woodrow, 1978
M56 Hapsford to Lea by Backford contract M56/11
Taylor Woodrow, 1978
M56 Hapsford to Lea by Backford contract M56/11
Taylor Woodrow, 1978
M56 Hapsford to Lea-By-Backford Contract M56/11 - P.F.A. Concrete Trials
Taylor Woodrow, 1978
Parametric study of web panels in pure shear
Rendel Palmer and Tritton Limited, 1978
Permanent Steel Shuttering: test on a prototype structurally participating permanent steel bridge shutter under repeated loading
Imperial College, 1978
Variable amplitude fatigue tests on welded joints
The Welding Institute, 1978
1977
Control of fatigue cracks by hole drilling
The Welding Institute, 1977
Fatigue of socketed cables: tests on 16mm soecimens
Imperial College, 1977
Lateral torsional bickling tests on reduced scale welded steel bridge girders
University of Sheffield, 1977
The depth of cover to steel reinforcement in highway bridges
Transport and Road Research Laboratory, 1977
The effects of steam curing on precast pretensioned bridge beams report on work to brief stage (c)
Newark, Notts Burks Green and Partners, 1977
1976
A parametric study of the ultimate load characteristics of plate girders
University College Cardiff, 1976
Crawler Lane study an economic evaluation
Martin and Voorhees Associates, 1976
Fatigue strength of butt welds between plates of different thicknesses: experimental work
The Welding Institute, 1976
Fatigue tests relevant to box girder bridges part 2: fatigue tests on conditinuous welds under shear loading Final report
The Welding Institute, 1976
Laboratory studies of the penetration of sand by bentonite slurry
Transport and Road Research Laboratory, 1976
Removal and repair of fatigue cracks
The Welding Institute, 1976
Repair and remedy of fatigue cracks evaluation of remedial repair techniques
The Welding Institute, 1976
Repair and remedy of fatigue cracks evaluation of standard repair techniques
The Welding Institute, 1976
Steel box girders: parametric study on plates under combined direct and shear in-plane loading
Imperial College, 1976
1975
Compressive tests on steel plates of low aspect ratio10
University of Cambridge Department of Engineering, 1975
Cumulative damage calculations taking account of low stresses in the spectrum
The Welding Institute, 1975
Fatigue tests on possible bridge deck repair welds
The Welding Institute, 1975
Instrumented drilling trials at Chinnor
Transport and Road Research Laboratory, 1975
Report on the trial application of the draft British standard fatigue rules for bridges
Maunsell, 1975
Survey of geometric imperfections in steel box girder bridges
Imperial College, 1975
The welding of reinforcing bars
The Welding Institute, 1975
Working party on sewers and water mains: first report
Department of the Environment, 1975
1974
Ground quality assessment: channel tunnel machine erection chamber - October 1974
Transport and Road Research Laboratory, 1974
Midland links motorways viaduct inspection 1974
Sir Owen Williams and Partners, 1974
Steel box girders: a review of the stability clauses in the Merrison Rules for Steel Box Girders
Imperial College, 1974
The behaviour of high strength friction grip bolted joints in box girder construction: a report on the testing of two box girder models.
Imperial College, 1974
The welding of reinforceing bars
The Welding Institute, 1974
1973
Plate failure in stiffened steel
Cambridge University of Cambridge Department of Engineering, 1973
Proposed fatigue design stresses for weld metal
The Welding Institute, 1973
Report on roads in tunnel for the Greater London Council
Halcrow, 1973
Roads in tunnel Great London Council
Halcrow, 1973
Roads in tunnel: Greater London Council
Halcrow, 1973
Speed/flow relations in the passenger tunnel at Heathrow Airport
Transport and Road Research Laboratory, 1973
The fatigue behaviour of welded reinforcing steels author: T.C. Harrison
British Steel Corporation, General Steels Division, 1973
1972
Bifurcated elevated highways: construction, instruction, and testing of four linearly elastic models
Imperial College, 1972
European Communities Act 1972
Her Majesty's Stationary Office, 1972
Precast concrete bridge shutters
Omnia Constructions Limited, 1972
Precast concrete bridge shutters: behaviour of full scale bridge model under static and dynamic loading
Imperial College, 1972
Precast concrete bridge shutters: behaviour of full-scale bridge model under static and dynamic loading
Imperial College, 1972
Precast concrete bridge shutters: behavoiur of full-scale bridge model under static and dynamic loading
Imperial College, 1972
Precast concretebridge shutters: behaviour of full scale bridge model under static and dynamic loading
Imperial College, 1972
Steel box girders: fatigue of Box Corner Welds subject to transverse bending
Imperial College, 1972
Steel box girders: parametric study on the shar lag phenomenon in steel box girder bridge
Imperial College, 1972
Steel box girders: proposed design rules for longitudinal stiffeners in compression flanges of box girders
Imperial College, 1972
1971
Re-analysis of fatigue data for welded joints in steel cumulative damage summation for Highway Loading Spectra
The Welding Institute, 1971
Use of corrugated metal decking as permanent formwork for composite bridge decks
Cambridge University of Cambridge, 1971
1979 | 1978 | 1977 | 1976 | 1975 | 1974 | 1973 | 1972 | 1971 |